365线上官网

365线上官网:CHINA MACHINERY INDUSTRY FIFTH CONSTRUCTION CORP INC.

365线上官网:Indonesia Baturaja Project

Construction Site: The Republic of Indonesia  Construction Time: 2016

365线上官网:Indonesia Papua 20 MW Coal Fired Power Station Project

Construction Site: The Republic of Indonesia  Construction Time: 2015

365线上官网:Indonesia South Kalimantan Conch Phase 2 Project

Construction Site: The Republic of Indonesia  Construction Time: 2015

365线上官网:Myanmar Mawlamyine MCL 2x20 MW Coal Fired Power Station Project

Construction Site: the Republic of the Union of M  Construction Time: 0

365线上官网:Thailand TPIPL Company Cement Production Line Project

Construction Site: the Kingdom of Thailand  Construction Time: 0

365线上官网:Thai Cement WHR-PG Project

Construction Site: the Kingdom of Thailand  Construction Time: 0

365线上官网:Thailand Asia Cement WHR-PG Project

Construction Site: the Kingdom of Thailand  Construction Time: 0

365线上官网:Guyana Skelton Output 8400ton/day Sugar Plant

Construction Site: 圭亚那  Construction Time: 2005

365线上官网:Korea Shuang Long Bus Production Line

Construction Site:  Construction Time: 0

365线上官网:BOANDA Bridge Production line Disassembled from Korea Wen Yang

Construction Site:  Construction Time: 0

365线上官网:Thailand General Contracting Steam Turbine Civil Plant

Construction Site:  Construction Time: 0

365线上官网:Malaysia Mega Steel Plant

Construction Site:  Construction Time: 0

365线上官网-365官方网站登陆